top of page
Seaview Laboratory
This project installed a contemporary laboratory with exacting requirements into an existing building in Seaview that had not been upgraded since it was built in the 1970’s. Structural work was minimised, while mechanical ventilation and drainage were carefully integrated into the building.
bottom of page